Search results

BOABARGE 32
www.boa.no/our-fleet/boa-barge-32

With a length of. 65 meters. , a beam of. 17.5 meters. , and a draft of. 4 meters. , the. BOABARGE 32. provides ample space for your cargo needs. Class Certification. : Certified by.

BOABARGE 42
www.boa.no/our-fleet/boa-barge-42

With a length of. 65 meters. , a beam of. 17.5 meters. , and a draft of. 4 meters. , the. BOABARGE 42. provides ample space for your cargo needs. Class Certification. : Certified by.

BOA Completes innovative Lift of Jack-up Rig Haven
www.boa.no/boa-expertise/case-study/boa-completes-innovative-lift-of-jack-up-rig-haven

BOA is proud to have partnered with Westcon Yards AS on a complex and innovative operation involving the float-on, shifting and float-off operation of the 4-legged jack-up rig, Haven, onto the semi-submersible BOABARGE 36.

BOABARGE 39-40
www.boa.no/our-fleet/boa-barge-39-40

Removable Floatation Towers: 4 towers for enhanced stability. Hybrid Operation: Solar, battery, generators and shore power integration for optimized energy efficiency. Technical specification. Built. 2027. Country. Norway. Vessel type.

BOABARGE 38
www.boa.no/our-fleet/boa-barge-38

Removable Floatation Towers: 4 towers for enhanced stability. Technical specification. Built. 2022. Country. Norway. Port of registry. Trondheim. Vessel type. Heavy Lift, Semi-Submersible Barge. Class.

Load-on, Transport and Float-off of Main Plinth for Storstrøm Bridge
www.boa.no/boa-expertise/case-study/load-on-transport-and-float-off-of-main-plinth-for-storstrom-bridge

Once securely positioned on the barge, BOABARGE 34 was towed and moored in a 4-point pre-laid mooring system close to the installation site.

BOA Reveal Plans for Next Generation Semi-Submersible Barges
www.boa.no/boa-expertise/press-release/boa-reveal-plans-for-next-generation-semi-submersible-barges

Ballasting capacity 20.000m3/hr. 4 x removable floatation towers. Hybrid operation battery/generators/shore power. BOA are targeting the selection of shipyard within 2024 with the first barge in operation in 2026. Share article. Copy link.

Launching of AOPS Vessels
www.boa.no/boa-expertise/case-study/launching-of-aops-vessels

BOA is proud to announce its engagement in a prestigious 4-year contract, with options for extension, to manage the load-out and float-off of six Arctic and Offshore Patrol Ships (AOPS).

BOA orders 1 + 1 Next Generation Semi-Submersible Barge
www.boa.no/boa-expertise/press-release/boa-orders-1-1-next-generation-semi-submersible-barge

Ballast Pump Capacity: 22.500 m³/hr. 4 Removable Floatation Towers. for enhanced stability and flexibility. Hybrid Power System: Solar, battery, generators, and shore power integration for optimized energy efficiency. Share article. Copy link. About BOA.