BOA DEEP C

  • Type: OCV
  • Built: 2003
  • Class: DNV-GL +1A1 ICE-C Tug Supply Vessel SF COMF-V(3)C(3) Heldk E0 DYNPOS-AUTRO Clean DK(+) TMON
  • Deck Space: 1,630 sqm
  • Crane: 250 t AHC / Crane 30 t AHC
  • AH Winch: 500 / 500 / 500 t
  • Bollard Pull: 229 t
  • ROV Operations: 2 x Oceaneering Millennium Plus, 2,000 m
  • Accommodation: 125
Download Specification

REFERENCES

CHARTERER
WORK
PERIOD
GMT/Exxon
Subsea Installation, construction and ROV inspections on USAN Oilfield
June 2017- January 2019
DOF
Hook up of the Yinson's FPSO John Agyekum Kufur
April 2017
Marine Platforms
Well Intervention
January-March 2017
ENI Petroleum
Intervention work
October 2016
Marubeni
HFL Diagnostics & AV Line remediation
September 2016
Cardon IV
W2W and Accommodation services
March-July 2016
Enbridge
Verify liquid flowing through submarine piping, Submerged pump connection, Connection by VLS's ROVs, Install FLS
June-July and October 2015
ExxonMobil
Topside Commissioning
July 2015
Murphy Oil
Rigid Jumper, STFL & EFLs
June 2015
Seabed Geosolutions
Placing seismic nodes on seabed at depth of abt 2000 meters for testing purposes.
April 2015
EMAS
Oil filed maintenance
April 2015
Technip
Lifting up a “stucked” pile
March 2015
Eni
Pig remediation
March 2015
Stone Energy
Install Two (2) well intervention on the Pompano Template
November 2014-January 2015
BP
lnstall 8 driven piles and pre-set chain
September-November 2014
EMAS
Jumper installations
September 2014
BP
Hydrate Asphalt remediation
July-August 2014
EMGS
Recover electromagnetic source and umbilical from seabed
June 2014
Marubeni
Pipe line flushing
June 2014
Murphy Oil
Repositioning submarine cable w/winch
February 2014
BP
General maintenance jumpers etc
January 2014
Anadarko
Plug & Abandon old wells
December 2013-January 2014
Boskalis
Installation of a twelve (12) points mooring system and hook-up of the OSX-3 FPSO.
July- September 2013
Tullow Oil
Rigless Well Intervention
April-May 2013
Mobil Equatorial Guinea
Remediate mooring lines of the FPU Zafiro Producer
Jan-March 2013
Technip
FPSO offloading system
October 2012
Statoil
Chain replacement
September 2012
Statoil
Volve STL Buoy Mooring Wire Replacement
August 2012
Statoil
Mooring chain replacements
July-August 2012
BP
Jumper installment
April-June 2012
MODEC
FPSO Mooring line hook-up
January-March 2012
Centrica
Athena mooring lines connections
August-November 2011
Atlantis Resources Corporation
Installing a Nacelle onto the gravity base structure
July 2011
Marathon
Installed moorings and SBM turret buoy
July 2011
Statoil
Chain recovery
June 2011
Bibby Offshore
Riser Replacement
May-June 2011
Venture Production
Recovery of the Kittiwake SAL and bring this to Stavanger, Norway
April 2011
BP
Install moorings for SKARV FPSO
October 2010- February 2011
BP
Deepwater Horizon- Assisting in stopping oil blow out
May-August 2010
BP
Prepare and execute APS Manifold Removal, pigging, jumper retrieval and installation activities and DC41 Manifold Swaps
March-April 2010
Maersk Drilling
FPSO mooring installation
December 2009-February 2010
BP
ROV survey and maintenance of gas injection pipeline
October 2009
Talisman Energy
ROV inspection of ULA storage tank at the YME field
October 2009
Technip
Jumpers and ROV work
August-September 2009
EnCana
Install Wellhead Protection Structures (WPS)
July 2009
StatoilHydro
Replacement of mooring lines at the Åsgard A and Njord A
June 2009
BP
Removing and installing rigid jumpers
April-May 2009
BP
Removing and installing rigid jumpers
March 2009
BP
Installing a subsea tree on Dorado SS-4 well
November 2008
BP
Subsea pump assay replacement and Sepla anchor bollard pull
November 2008
BP
Install a Guideline less Re-entry Assembly (GRA)
November 2008
BHP Billiton
Installment of STFL's, EFL's and Jumpers
September-October 2008
BP
Removing and installing rigid jumpers
September 2008
Chevron
Changed out H-links and hook up 8 mooring lines to semi sub.platform
July 2008
Chevron
Remediation of strakes with diver support at Tahiti spar platform
July 2008
Chevron
Clean up damaged structures with diving support after hurricane damages
April 2007-July 2008
Noble Energy
Clean up damaged structures with diving support after hurricane damages
May 2005-March 2007
Chevron
Towgin of FPSO, install template, repair subsea pump
March-April 2005
MODEC
Installation and hook-up of mooring to FPSO Baobab
January-February 2005
Pertra
Installing riser at Varg
December 2004
Statoil
Subsea work
December 2004
Woodside Mauretania
Installing mooring system for Chinguetti field FPSO
October 2004
Statoil
Transporting and Installing Subsea templates
August-September & November 2004
Statoil
Subsea Installations
July-August 2004
Statoil
Installing subsea structures at Snøhvit field
June 2004