Successful load-out and float-off of AOF 1

BOA have successfully completed load-out and float-off of Arctic Offshore Farming’s  (AOF 1) fish farm Cage A with the semi-submersible sister-barge Boa Barge 35 and Boa Barge 36 (124×31.5m, 17500 dwt) in tandem configuration at Aker Verdal. The Dual Barge Linkage System was designed by our inhouse Engineering Dept together with all required Ballast Procedures […]

Read More…

From Crisis to Positive Numbers

In a tough industry, BOA points to another quarter of revenue growth: In the first half of the year, operating revenues are as much as 90 million higher than at the same time last year. And that only a few years after the bankruptcy threatened the company.   The oil crisis in 2014 has left […]

Read More…