The semi submersible barge was modified in order to load out and float off the caissons that will form the breakwater for the Greater Tortue Ahmeyim project at the border between Mauritania and Senegal. To safely load out and float off the caissons with a weight of abt. 16.200 t with a floating draft of […]
BOA Barge 33 delivered to Eiffage GC Marine for the BP’s GTA Project
