Contact


 

BOA

 

Strandveien 43

7067 Trondheim

Norway

 

Phone: +47 73 99 11 99

            (Switchboard)

Fax:     +47 73 99 11 98

E-mail: office@boa.no


 

BOABARGE 29/30/35/36

BOABARGE 29/30/35/36

Description: Dimensions:
Heavy Lift, Semisubmersible

124 x 31,5 x 7,93 

 

Reference List

   

BOABARGE 29

   
Abromex Transport of modules in Peru 30.08.16 - 02.03.17
Saint Mary Leeve's District High level water containment system of a river 09.01.16 - 30.07.16
Smith Maritime Inland Barges Transport 15.09.13 - 29.01.15
Marine MultiService Oil Barge transport 28.02.15 - 15.04.15
Protexa/Pemex Jacket Launching 15.09.13 - 29.01.15
SMC Transport of offshore structures 20.01.13 - 28.05.13
Protexa/Pemex Transport of offshore structures 22.08.12 - 17.12.12
Cotemar Dual Barge Dry-docking 13.05.12 - 22.07.12
Petrosucre Corocoro CPF Transport & Floatover 31.03.11 - 10.11.11
Seabridge Marine Transports  24.12.07 - 03.03.11

BOABARGE 30

   
Gruppo Antonini Storage and transport of jacket and topside 22.03.16 - 19.01.17
Etopo Transport of lifeboats from US to Nigeria 16.01.16 - 21.03.16
SapuraKencana/Pemex Transport of offshore structures 26.05.15 - 30.09.15
Protexa/Pemex Jacket Launching 10.10.13 - 31.03.15
Cotemar Dual Barge Dry-Docking 13.05.12 - 22.07.12
Dockwise Corocoro CPF Bridge Install 10.08.11 - 10.11.11
Kleven Yard Storage & Transport 05.04.09 - 01.08.11
Havyard Docking 26.01.09 - 04.04.09
In-house Transport of Hull & Barges 09.08.08 - 26.11.08

BOABARGE 35

   
Chevalier Floatels Transport of floatel "Transit" 13.12.14 - 02.01.15
AMT Transport of Aircraft carrier mod. 25.07.14 - 23.08.14
Leighton Contractors Gorgon LNG Caisson Transport 01.08.12 - 19.02.14
AMT Transport of Aircraft carrier mod. 01.05.12 - 11.06.12
SPT Offshore Loadout & Installation of Platform 14.05.10 - 06.10.10
Havyard Docking of vessels 20.01.10 - 01.03.10
Inhouse Transport of hull & barges 16.07.09 - 11.10.09

BOABARGE 36

   
Abeking & Rasmussen Yacht float-off 20.12.16 - 13.01.17
VTT Marine AS Submarine float-on and rolled onto land 31.03.16 - 02.05.15
Seaway Heavy Lifting Transport 07.04.15 - 09.06.14
In-house In-house docking 16.06.14 - 15.07.14
Bladt Transport 01.07.13 - 04.09.13
Havyard Docking 20.05.13 - 02.07.13
Bilfinger Berger Windmill Project 24.10.11 - 24.12.12
SBM Offshore Deep Panuke Project 15.06.10 - 05.10.11
     

 

 

 

For further information complete specifications are available

Click here to download a pdf-file with specifications